Anglesey Railways Through Time
- Paperback
96 pages
- Release Date
14 February 2014
Summary
A railway arrived on Anglesey in 1848, linking London and Dublin. It was the great railway engineer Robert Stephenson who ensured that the railway link to Ireland would run along the North Wales coast to Holyhead when he presented plans that overcame the engineering challenges associated with the route. A branch was subsequently built from Gaerwen to Amlwch after the LNWR absorbed the CHR. This Anglesey Central Railway was first opened in around 1865 and completed in 1867. The LNWR won the contract to carry the Royal Mail by rail, but it was the City of Dublin Steam Packet Company that carried the mails across the Irish Sea. The LNWR did, however, build a magnificent inner harbour in the 1880s. The railway still runs from London to Holyhead and boats continue to sail from Holyhead to Ireland, but today only the Llanfair P.G., Valley (which serves the RAF base) and Holyhead stations remain.
Book Details
| ISBN-13: | 9781445608716 |
|---|---|
| ISBN-10: | 1445608715 |
| Author: | Mike Hitches |
| Publisher: | Amberley Publishing |
| Imprint: | Amberley Publishing |
| Format: | Paperback |
| Number of Pages: | 96 |
| Release Date: | 14 February 2014 |
| Weight: | 305g |
| Dimensions: | 165mm x 234mm |
| Series: | Through Time |

You Can Find This Book In
Mike Hitches
Mike Hitches is a prolific author, having written several railway and local interest books. His previously published work covers North Wales and the West Midlands as well as Scarborough and he has plans for further titles covering other areas in Yorkshire. Mike’s local interest titles are mainly based in Wales but he is planning more for the North Yorkshire area. Mike lives in Filey, North Yorkshire.
Returns
This item is eligible for simple returns within 30 days of delivery. Return shipping is the responsibility of the customer. See our returns policy for further details.